Red Rocks Cobra
  • Home
  • Build Overview
  • Build Blog
    • 1/3/2025: Finally setting up the Fuel Link!
    • 10/6/24: Attaching the Classic Instruments Fuel Link
    •  6/18/24: Some wiring and a new throttle linkage.
    • 6/8/24: In my new shop!
    • 1/22/24: Waiting, waiting
    • 11/14/22: Headers arrive!
    • 11/5/22: The engine is in!
    • 7/25/20: Some electrical and cooling
    • 6/29/20: The footbox cooling system.
    • 12/16/19: more instrument panel work
    • 4/16/19: instrument panel work.
    • 9/11/18: Getting to Al work plus some wiring.
  • Construction Steps
    • Build checklist
    • Body Buck Construction
    • Front suspension
    • Front disc brakes
    • 3-Link
    • Hydraulic clutch lines
  • Photo Album Directory
  • Supplementary technical data
  • My Rocketry Projects
    • General rocketry photos
    • Der Red Max
    • Great Goblin
    • Apogee Zephyr
Select Page

General rocketry photos

Jolly Logic altimeter, accelerometer, etc.

My friend John with his Arcus L1 certification flight

A small Arcus being launched.

  • Facebook
  • X
  • Instagram
  • RSS

Designed by Elegant Themes | Powered by WordPress